泉州附近有没有服务

156 6698 0000
 Mesh belt
 Net Conveyor
 Net Conveyor
Industry news
You Are Here: home page  >  Industry news

What should be paid attention to when using chain conveyor for the first time?

Browse: three hundred and fifty-three Editor in charge: admin Release date: 2020-07-10 17:50:23

Running on the production line of the enterprise Chain conveyor In the process, the multi row chain plates can be arranged in parallel to make the chain plate conveyor produce a large differential speed, and the speed difference of the multi row chain plates is used to transport multiple chain plates.

It is very important to strengthen the normal inspection and protection of the chain plate conveyor, prolong the service life of the equipment, adhere to the equipment, and improve the stability of the equipment. Therefore, it is necessary to improve the working ethics of the staff to prevent accidents and to improve the operational skills of the staff effectively. The conveyor chain of chain plate conveyor should be inspected regularly and the problem should be handled or replaced in time.

If the connecting rod is not reliable, it should be replaced in time due to excessive deformation and overtime wear; after working on the chain plate conveyor for a period of time, the direction of the horizontal connecting rod and the linear connecting rod can be changed to change the wear direction and extend the connection. The service life of the chain; timely adjust the tension of the conveyor chain to ensure the pre tightening of the conveyor chain; the spacing of the plates should meet the requirements of the equipment, and the short and damaged chain plates should be filled or replaced in time; the excessive wear of the power sprocket should be timely replaced to prevent damage to other components and transmission chain; when using the old chain, please use the same length of chain. Different chain lengths and weak link strengths are prohibited.

 Chain conveyor

During the operation of chain plate conveyor, it is forbidden to hang materials, which will lead to material accumulation and overload, and timely remove a large number of materials. The feed farm can add bulk and waste selection equipment; the chain slot of chain plate conveyor is small, so foreign matters can be handled timely to prevent chain from entering; rough operation and frequent starting of tooth root can prevent full load and overload starting.

When installing a new belt or securing an old one to the belt, make sure that the belt is straight at all times. In order to make the chain plate conveyor run linearly, a good groove will be formed when the chain plate conveyor is empty to ensure that the chain plate conveyor is in close contact with the horizontal roller. In addition, all rolls of the chain conveyor line running forward and those perpendicular to the focus of the conveyor.

For the chain plate conveyor with short conveying distance, the tensioned steel wire focusing line can be used as the standard rod to make the roller and the roller form a right angle. For long distance belt conveyor lines, tension lines connected to reference points can be used for installation.

 Chain conveyor

When debugging the new chain plate conveyor, first of all, the chain plate conveyor should be adjusted to the middle position of the front roller and the rear roller. All rollers are installed at right angles to the coke line of the conveyor. However, when the chain conveyor is in a round-trip state, the fine adjustment of the buffer drum is very important, which is very useful for debugging. If there is a buffer roller at the end, fine tuning will help guide the conveyor belt in the middle of the tail roller. If the tail roller does need to deviate slightly from the focal line, the conveyor belt will first move towards the edge of the roll. For long distance chain conveyor, one person is required to operate the belt for the front and rear rollers.